Scope of work
- Repair and protect deteriorated concrete.
- Strengthen structures, including with ultra-high-performance fibre-reinforced concrete (UHPFRC).
- Jack bridge decks to replace bearings and renew expansion joints.
Project example
Pihem Viaduct (A26). Ævia renewed reinforced-concrete edge beams, jacked the deck to replace bearings and renewed joints and sections of waterproofing. Project source
